Summary as introduced: Siting of landfills. Reduces the distance that a landfill can be sited from a groundwater supply. Currently, a landfill cannot be constructed within five miles of a groundwater public supply intake. The bill prohibits the construction of a landfill within 500 feet of an existing groundwater supply. The bill also increases the acreage threshold for allowing a landfill to be constructed or expanded in a nontidal wetland. Under the existing law, permits may be issued for the construction or expansion of a landfill that impacts less than 1.25 acres of nontidal wetlands. This bill would allow the issuance of a permit for a landfill that would impact less than 3.5 acres, provided that the wetlands are replaced on a two-to-one basis with wetlands of an equal or higher environmental value as determined by the Director of the Department of Environmental Quality. (emphasis mine)
Summary as passed House: Siting of landfills. Reduces from five miles to three miles the distance that a landfill can be sited from a surface water or a groundwater supply intake or reservoir. However, a landfill can be constructed as close as one mile from any existing surface or groundwater supply if the landfill meets certain conditions. The bill also increases the acreage threshold for allowing a landfill to be constructed or expanded in a nontidal wetland. Under existing law, permits may be issued for the construction or expansion of a landfill that impacts less than 1.25 acres of nontidal wetlands. This bill would allow the issuance of a permit for a landfill that would impact less than two acres. The bill authorizes the Director of the Department of Environmental Quality to issue a permit for an expansion of a landfill located in a wetland only under certain specific conditions, such as the proposed site has to be at least 100 feet from any surface water body and one mile from any tidal wetland and that there is a minimum two-to-one wetlands mitigation ratio. (emphasis mine)
AEGIS Waste Solutions Inc | $1,900 |
Synagro Technologies Inc | $750 |
Waste Management Inc | $750 |
Allied Waste/Brunswick Management Facility | $500 |